Roadworks

Stop

Ste Zithe

Info

Roadworks
L. 19 construction site: stop Ste Zithe moved a hundred meters at the level of the place de Metz
From July 4, 2022, until the end of the work, as part of the Pétrusse bd construction site, the Ste Zithe stop is moved a hundred meters to the Place de Metz.

 

See all ongoing incidents on our interactive map