Skip to main content
menu

Project description

The City of Luxembourg is carrying out redevelopment work along Montée Thommes in Rollingergrund. These works are being done in cooperation with:

  • VDL – Service Voirie (Roads Department): Redevelopment of the Montée Thommes road superstructure. Redevelopment of the street and pavement.
  • VDL – Service Eaux (Water Department): Complete replacement of the principal water mains and replacement of home utility connections that have deteriorated.
  • VDL – Service Canalisation (Sewer Department): Replacement of the combined wastewater drains between numbers 14A and 22, as well as the connections to those houses.
  • VDL – Service Eclairage public (Public Lighting Department): Renewal and enhancement of the public lighting system, and replacement of street lamps.
  • VDL – Service TIC (ICT Department – network and communications): Renewal and expansion of the fibre-optic network with Hotcity.
  • Creos Luxembourg SA Électricité: Replacement and enhancement of the low-voltage (220V) grid, which is insufficient by its current design, and the condition of which has deteriorated. Replacement of home utility connections. Repairs to the public lighting and Hotcity connections.
  • Creos Luxembourg SA Gaz: Complete replacement of the principal gas main and replacement of home utility connections that have deteriorated.
  • Post Luxembourg: Replacement of old cables with high-speed fibre-optics and replacement of home utility connections.

Works schedule

Commencement of work: September 2018

Planned duration: 220 working days

Planned completion: summer 2019

Traffic information

What is the current traffic situation?

For vehicular traffic:

Montée Thommes will be closed to traffic and the affected sections will be closed off to traffic, one by one, as the project progresses.

Vehicular access to private property will be maintained as long as physically possible. Pedestrian access and access for emergency services will be guaranteed throughout the duration of the works.

For businesses and deliveries:

The City of Luxembourg will try to ensure access for deliveries to local businesses throughout the duration of the works.

For public transport users:

No changes.

As construction progresses, the traffic constrictions will change. The City of Luxembourg thanks local residents and businesses, as well as road users, for their understanding regarding any potential inconveniences.

Progress to date

Project update:

Work will begin in September 2018.

How long will the work take?

Planned completion: summer 2019

What work has already been completed?

Work will begin shortly.

What remains to be done?

Around September, the contractor will begin certain preparatory work, and then will start by laying water and gas mains, and dry utility networks.

Your home utility connections

  • As part of the construction project, Luxembourg City representatives and private contractors will visit residents' home to assess the condition of their existing connections.
  • If you wish to have your existing connections replaced, please inform the Luxembourg City representatives during this on-site inspection.

If you have any problems with your gas, water, or communications networks, please contact the departments below, which are open 24/7:

  • Service Eaux – Tel: 4796-2883
  • Creos Électricité – Tel: 8002-9900
  • Creos Gaz – Tel: 8007-3001
  • Post Luxembourg – Tel: 8002-8004
  • Eltrona – Tel: 499 466 888

Stay informed

To make life easier for residents while these works are being carried out, the City of Luxembourg has implemented a series of measures, including the option to participate in site meetings. Residents affected by the works may participate in these meetings to obtain additional information about the project's progress and present any complaints they may have.

Weekly site meetings

The dates and times of these meetings will be provided shortly.

Contacts for this work site

DEPARTMENT CONTACT TELEPHONE

VDL – Service Coordination des chantiers

Martine Fey

4796-2804

VDL – Service Eaux

Steve Philippi

4796-4346

VDL – Service TIC

Patrick Antunes

4796-3381

VDL - Service Circulation

Josh den Hollander

4796-3344

VDL – Service Éclairage public

Daniel Perrard

4796-4989

VDL – Service Voirie

Sebastian Schinner

4796-3879

VDL – Service Canalisation

Gilles Biskup

4796-3302

VDL – Construction mediators

chantiers@vdl.lu

4796-4343

Creos Luxembourg Gaz

Gary Scheid

2624-5821

Creos Luxembourg Électricité

Marc Bastian

2624-5755

POST Télécommunication

Bureau Technique (Technical Office)

4991-5763


Contact
the department

Contact details

Info-box

20-22, rue des bains
L-1212 Luxembourg

Opening hours

Monday–Friday

8:30–17:00


Contact
the department

Contact details

Bâtiment « Rocade »

3, rue du Laboratoire
L-1911 Luxembourg

Getting there by bus


Contact
the department

Contact details

Kofferfabrik

98-102, rue Auguste Charles
L-1326 Luxembourg

Getting there by bus

Opening hours

Monday–Friday

8:00–12:00 and 13:30–17:00

Contact details

Rocade

3, rue du Laboratoire
L1911 Luxembourg

Getting there by bus


Contact
the department

Contact details

338, rue du Rollingergrund
L-2442 Luxembourg

Getting there by bus

Opening hours

Monday–Friday

8:00–12:00 and 13:00–17:00

Out-of-hours service

4796-3003


Contact
the department

Contact details

2, Bd F.D. Roosevelt
L-2450 Luxembourg

Opening hours

Contact details

3, rue du Laboratoire L-1911 Luxembourg
2, bd Roosevelt L-2450 Luxembourg

Getting there by bus

Opening hours

Monday–Friday

8:00–12:00 and 14:00–16:00


Contact
the department

Contact details

Bâtiment Rocade

3, rue du Laboratoire
L-1911 Luxembourg

Getting there by bus