Skip to main content
menu

Project description

Upgrade works in Merl, on Rue des Ligures, Rue de la Barrière, Rue de Virton and Rue de St. Gengoul. These works are being done in collaboration with:

  • VDL – Service Voirie (Roads Department): Redevelopment of the superstructure on these roads. Redevelopment of curbside parking. Installation of pedestrian crossings for people with reduced mobility.
  • VDL – Service Eaux (Water Department): Replacement of the principal water mains and deteriorated connections to houses.
  • VDL – Service Canalisation (Sewer Department): Installation of combined water pipelines and a wastewater collection system in the Rue de la Barrière / Rue des Ligures / Rue des Celtes sector. Reconstruction of the local sewer lines on Rue de St. Gengoul and Rue de Virton. Installation of a rainwater line and wastewater line intended for special development plan zones located uphill of Rue de Merl.
  • VDL – Service Eclairage public (Public Lighting Department): Replacement of cables for public lighting systems and street lamps.
  • VDL – Service TIC (ICT Department – network and communications): Renewal and expansion of the fibre-optic network with Hotcity.
  • Creos Luxembourg SA Électricité: Replacement of the low-voltage/medium-voltage grids, replacement of a number of connections to houses and installation of a backup conduit along the entire work site. Upgrade of the existing high-voltage grid.
  • Creos S.A. Division Gaz: Replacement of the mains and a number of connections to houses. Upgrade of the existing high-pressure grid.
  • Creos Luxembourg SA Gaz: Replacement of mains and certain home connections. Upgrade of the existing high-pressure grid.
  • Post Luxembourg & Eltrona: Replacement of old cables with optical fibre and replacement of connections to houses.

Works schedule

Commencement of works: September 2019

Contractual deadline: 500 working days

End of work: winter 2021

Traffic information

What is the current traffic situation?

For vehicular traffic:

The affected sections will be closed off to traffic, one by one, as the project progresses. At all times, a 3.5-metre passage will remain open to motorists and the emergency services. During the first phase of the roadworks, Rue Virton and Rue des Ligures will be closed to traffic.

Vehicular access to private property will be maintained as long as physically possible. A diversion route for cyclists will be put in place by the Service Circulation. Pedestrian access and access for emergency services will be guaranteed throughout the duration of the works.

For businesses and deliveries:

The City of Luxembourg will try to ensure access for deliveries to local businesses throughout the duration of the works.

For public transport users:

As of October 2019, bus line 15 will be rerouted according to the progress of the road works.

Progress to date

Project update:

Work will begin in September 2019.

How long will the work take?

Planned completion: summer 2021

What work has already been completed?

The external consulting agency is currently carrying out its on-site inspections before work can begin.

What remains to be done?

On Rue de Virton, the contractor will begin by installing temporary water and gas conduits before replacing the mains. Once this has been done, the contractor will begin working on the dry utility networks, preparing the site for needs of the Service Éclairage Public, Creos Électricité, the Service TIC and the Post. At the same time, the contractor will carry out surveying work on Rue des Ligures.

Your home utility connections

  • As part of the construction project, City representatives and private contractors will visit residents' homes
  • to assess the condition of their existing connections.
  • If you wish to have your existing connections replaced, please inform the City representatives during this on-site inspection.

If you experience any problems with your gas, water or communications networks, please call the numbers below, which are available 24/7:

  • Service Eaux – Tel: 4796-2883
  • Creos Électricité – Tel: 8002-9900
  • Creos Gaz – Tel: 8007-3001
  • Post Luxembourg – Tel: 8002-8004
  • Eltrona – Tel: 499 466 888

Stay informed

Most recently updated works schedule

Contacts for this work site

DEPARTMENT

CONTACT

PHONE

VDL – Service Coordination des chantiers

Romain Dias

4796-3166

VDL – Service Eaux

Carole Kirch

4796-4304

VDL – Service Technologies de l'information et communication

Luis Carvalho

4796-3834

VDL – Service Eclairage public

Daniel Perrard

4796-4989

VDL – Service Voirie

Sebastian Schinner

4796-3879

VDL – Service Canalisation

Katarina Pecirep

4796-3072

VDL – Construction mediator

chantiers@vdl.lu

4796-4343

Creos Luxembourg Gaz

Gary Scheid

2624-5821

Creos Luxembourg Électricité

Marco Ferreira

2624-5780

POST Télécommunication

CALL CENTRE

8002-8004


Contact
the department

Contact details

20-22, rue des bains
L-1212 Luxembourg

Opening hours

Monday–Friday

8:30–17:00