Creos Gaz, in cooperation with the City, is currently improving infrastructure in Limpertsberg: Rue Jean Baptiste Fresez. The following departments will be involved in this collaborative effort:

  • VDL – Service Voirie (Roads Department): Repaving of Rue Jean Baptiste Fresez across the entire site.
  • VDL – Service Eaux (Water Department): Replacement of water mains. Connection of houses to the new mains.
  • Service Canalisation (Sewer Department): Replacement of the wastewater and rainwater drains, and of the connections to houses.
  • VDL – Service Eclairage public (Public Lighting Department): Replacement of public lighting.
  • VDL – Service TIC (ICT Department – network and communications): Installation of a fibre-optic network with Hotcity posts.
  • Creos Luxembourg SA Électricité: Replacement of the electrical cables in the pavements and the connections to houses.
  • Creos Luxembourg SA Gaz: Replacement of gas mains. Connection of houses to the new mains.
  • Post Luxembourg: Replacement and enhancement of networks in the pavement and of the connections to houses.

Construction schedule

Commencement of work: End of April 2018

Planned duration: 220 working days

Planned completion: Beginning of October 2019

Traffic information

What is the current traffic situation?

For vehicular traffic:

Traffic still runs one way on Rue Jean Baptiste Fresez, and a 3.5-metre wide passage will remain open to vehicles at all times for local residents and the emergency services.

Vehicular access to private properties will be maintained as long as physically possible. However, pedestrian access will be guaranteed throughout the duration of the works.

For businesses and deliveries:

The City will try to ensure access for deliveries to local businesses throughout the duration of the works.

For public transport users:

No changes. Routes will remain unaffected.

As construction progresses, the traffic constrictions will change.

Progress to date

Project update:

Due to bad weather and a slight change in the phasing schedule, and to keep as many parking spaces as possible open, the works will not be completed until early October 2019.

How long will the work take?

Planned completion: Beginning of October 2019

What work has already been completed?

The contractor has completed the work on the dry utility networks and home utility connections on the even-numbered side of the street. They are now carrying out the paving work on the even-numbered side of the street.

What remains to be done?

On the even-numbered side of the street, work is underway to upgrade the pavement, parking zones and roadway, and to install tree planters. After completing the work on the even-numbered side of the street, the contractor will move to the odd-numbered side of the street, where they will start with the work on the dry utility networks and utility connections, and conclude by upgrading the pavement and parking zones and installing tree planters.

Your home utility connections

  • As part of the construction project, City representatives and private contractors will visit residents' homes
  • to assess the condition of their existing connections.
  • If you wish to have your existing connections replaced, please inform the City representatives during this on-site inspection.

If you experience any problems with your gas, water or communications networks, please call the numbers below, which are available 24/7:

  • Service Eaux – Tel: 4796-2883
  • Creos Électricité – Tel: 8002-9900
  • Creos Gaz – Tel: 8007-3001
  • Post Luxembourg – Tel: 8002-8004
  • Eltrona – Tel: 499 466 888

Stay informed

To make life easier for residents while these works are being carried out, the City has implemented a series of measures, including the option to participate in site meetings. Residents affected by the works may participate in these meetings to obtain additional information about the project's progress and present any complaints they may have.

Weekly site meetings

Every Tuesday at 9:00 at the site.

Contacts for this work site

DEPARTMENT CONTACT TELEPHONE

VDL – Service Eaux

Carole Kirch

4796-4304

VDL – Service TIC

André Wagner

4796-3838

VDL – Service Circulation

Paul Bourg

4796-3370

VDL – Service Eclairage public

Daniel Perrard

4796-4989

VDL – Service Voirie

Bob Bremer

4796-3032

VDL – Service Canalisation

Katarina Pecirep

4796-3073

VDL – Construction mediators

chantiers@vdl.lu

4796-4343

Creos Luxembourg Gaz

Diane Hoffmann

2624-5819

Creos Luxembourg Électricité

André Degraux

2624-5783

POST Télécommunication

Bureau Technique (Technical Office)

4991-5763


Contact
the department

Contact details

Info-box

20-22, rue des bains
L-1212 Luxembourg

Opening hours

Monday–Friday

8:30–17:00