Project description

  • VDL Service Voirie (Roads Department): Upgrade of Rue Henri VII.
  • VDL Service Canalisation (Sewer Department): Replacement of the wastewater and rainwater collection system, and of connections to houses.
  • VDL Service Eaux (Water Department): Complete replacement of the principal main and replacement of deteriorated home utility connections.
  • VDL – Service Eclairage public (Public Lighting Department): Replacement and upgrade of the public lighting system, and replacement of street lamps.
  • Creos Électricité: Replacement and upgrade of the low-voltage (220V) grid, which is insufficient in its current design and generally in a state of deterioration Replacement of home utility connections.
    Repairs to the public lighting and Hotcity connections.
  • CREOS Gaz: Complete replacement of the principal gas main and replacement of deteriorated home utility connections.
  • POST Technologies – telecommunications networks: Post Luxembourg: Replacement of old cables with high-speed fibre-optics and replacement of home utility connections.
     

Works schedule

Planned commencement: September 2018

Planned duration: 150 working days

Planned completion: June 2019

Traffic information

What is the current traffic situation?

For vehicular traffic:

Throughout the works, Rue Henri VII will be closed to all traffic except local residents and suppliers. Vehicular access to private properties will be maintained as long as physically possible. Pedestrian access and access for emergency services will be guaranteed throughout the duration of the works.

For businesses and deliveries:

The City will try to ensure access for deliveries to local businesses throughout the duration of the works.

For public transport users:

No changes.

As construction progresses, the traffic constrictions will change.

Stay informed

To make life easier for residents while these works are being carried out, the City has implemented a series of measures, including the option to participate in site meetings. Residents affected by the works may participate in these meetings to obtain additional information about the project's progress and present any complaints they may have.

Weekly site meetings

Every Friday at 11:00 at the site.

Contacts for this work site

DEPARTMENT

CONTACT

TELEPHONE

VDL – Service Coordination des chantiers

Martine Fey

4796-2804

VDL Service Voirie

Caroline Blaise

4796-2608

VDL – Service Eaux

Carole Kirch

4796-4304

VDL – Service Éclairage public

Daniel Perrard

4796-4989

VDL – Service Canalisation

Katarina Pecirep

4796-3072

VDL – Construction mediators

chantiers@vdl.lu 

4796-4343

Creos Luxembourg Gaz

Gary Scheid

2624-5821

Creos Luxembourg Électricité

Claude Almeida

2624-5727

POST Télécommunication

Bureau Technique (Technical Office)

4991-5763


Contact
the department

Contact details

20-22, rue des bains
L-1212 Luxembourg

Opening hours

Monday–Friday

8:30–17:00


Contact
the department

Contact details

3, rue du Laboratoire
L-1911 Luxembourg

Getting there by bus


Contact
the department

Contact details

98-102, rue Auguste Charles
L-1326 Luxembourg

Getting there by bus

Opening hours

Monday–Friday

8:00–12:00 and 13:30–17:00

Contact details

3, rue du Laboratoire
L1911 Luxembourg

Getting there by bus


Contact
the department

Contact details

2, Bd F.D. Roosevelt
L-2450 Luxembourg

Opening hours


Contact
the department

Contact details

3, rue du Laboratoire
L-1911 Luxembourg

Getting there by bus