Skip to main content
menu

Project description

The City of Luxembourg is carrying out road improvement works in Cents on Boulevard Jules Salentiny and Rue Henri Frommes. These works are being done in cooperation with:

  • VDL – Service Voirie (Roads Department): Complete redevelopment of Boulevard Jules Salentiny and Rue Henri Frommes. Installation of pedestrian crossings for people with reduced mobility.
  • VDL – Service Eaux (Water Department): Complete replacement of the principal water mains and replacement of home utility connections.
  • VDL – Service Éclairage public (Public Lighting Department): Replacement of public lighting installations and street lamps.
  • VDL – Service TIC (ICT Department – network and communications): Extension and upgrade of Luxembourg City's fibre-optic network. Extension of the Hotcity network.
  • Creos Luxembourg SA Électricité: Replacement of the low-voltage/medium-voltage grids, replacement of a number of connections to houses and installation of a backup conduit along the entire work site.
  • Creos Luxembourg SA Gaz: Replacement of mains and certain connections to houses. Upgrade of the existing medium-pressure (MP) network.
  • Post Luxembourg & Eltrona: Replacement and upgrade of the sub-pavement network and of connections to houses along the entire length of the work site.

Works schedule

Commencement of works: June 2019

Planned duration: 280 working days

Planned completion: end of 2020

Traffic information

What is the current traffic situation?

For vehicular traffic:

The affected sections will be closed off to traffic, one by one, as the project progresses. However, 3.5-metre-wide passages will remain accessible to motorists at all times.

Pedestrian access and access for emergency services will be guaranteed throughout the duration of the works.

For businesses and deliveries:

The City of Luxembourg will try to ensure access for deliveries to local businesses throughout the duration of the works.

For public transport users:

No changes

Progress to date

Project update:

Work recommenced on 20 April 2020.

How long will the work take?

Planned completion: end of 2020

What work has already been completed?

For the first section (Boulevard Jules Salentiny), new water and gas mains have been installed.

What remains to be done?

Works on the dry utility networks and road superstructure are underway on the first section.
New water and gas mains are also being installed on the second section. Once complete, work on the road superstructure will begin.
On the third and fourth sections, the contractor has to perform works for new water and gas mains, the dry utility networks and road superstructure.

Your home utility connections

  • As part of the construction project, City representatives and private contractors will visit residents' homes to assess the condition of their existing connections.
  • If you wish to have your existing connections replaced, please inform the City representatives during this on-site inspection.

If you experience any problems with your gas, water or communications networks, please call the numbers below, which are available 24/7:

  • Service Eaux – Tel.: 4796-2883
  • Creos Électricité – Tel.: 8002-9900
  • Creos Gaz – Tel.: 8007-3001
  • Post Luxembourg – Tel.: 8002-8004
  • Eltrona – Tel.: 499 466 888

Stay informed

To make life easier for residents while these works are being carried out, the City of Luxembourg has implemented a series of measures, including the option to participate in meetings regarding the progress of the work. Residents affected by the works may participate in these meetings to obtain additional information about the project's progress and present any complaints they may have.

Weekly site meetings:

The date of the meeting will be publicised shortly.

Contacts for this work site

DEPARTMENT

CONTACT

PHONE

VDL – Service Coordination des chantiers (Work Site Coordination Department)

Romain Dias

4796-3166

VDL – Service Eaux

Carole Kirch

4796-4304

VDL – Service TIC

Luis Carvalho

4796-3381

VDL – Service Circulation (Traffic Department)

Marc Schumacher

4796-2658

VDL – Service Éclairage public

Daniel Perrard

4796-4989

VDL – Service Voirie

Caroline Blaise

4796-2608

VDL – Construction mediators

chantiers@vdl.lu

4796-4343

Creos Luxembourg Gaz

Simoes Carlos

2624-5816

Creos Luxembourg Électricité

André Degraux

2624-5783

POST Télécommunication

Bureau Technique (Technical Office)

4991-5763


Contact
the department

Contact details

Opening hours

Monday–Friday

8:30–17:00