Bonnevoie: Rue Marguerite-Séraphine Beving, Rue Xavier de Feller, Rue Jean-Baptiste Gellé, Rue Henri Vannérus, and Rue Pierre Krier

Project description

Creos Gaz, in cooperation with the City of Luxembourg, is currently improving infrastructure in Bonnevoie. Work will be carried out on the following roads: Rue Marguerite-Séraphine Beving, Rue Xavier de Feller, Rue Jean-Baptiste Gellé, Rue Henri Vannérus, and Rue Pierre Krier. The following departments will be involved in this collaborative effort:

  • VDL – Service Voirie (Roads Department): alteration of crossings to meet the needs of people with reduced mobility (PRM) and upgrading of bus stops.
  • VDL – Service Eaux (Water Department): replacement of the principal water mains and replacement of home utility connections.
  • Service Canalisation (Sewer Department): replacement of the wastewater and rainwater drains, and of connections to houses.
  • VDL – Service Éclairage public (Public Lighting Department): replacement of public lighting.
  • VDL – Service Circulation (Traffic Department): extension and upgrade of the existing network.
  • Creos Luxembourg SA Gaz: replacement of gas mains and certain home connections.
  • Creos Luxembourg SA Électricité: replacement of the electrical cables in the pavement as well as certain connections to houses.

Works schedule

Commencement of work: September 2019

Planned duration: 350 working days

Planned completion: April 2021

Traffic information

What is the current traffic situation?

For vehicular traffic:

The affected sections will be closed off to traffic as the project progresses. At all times, a 3.5-metre passage will remain open to cars.

Since the beginning of these roadworks, Rue Marguerite-Séraphine Beving and Rue Vannérus have been closed to all traffic except local residents and suppliers. As of 9 November 2019, Rue Pierre Krier will also be closed to traffic on the section between Rue de Carignan and Rue Jean-Baptiste Gellé for a minimum period of two weeks.

Vehicular access to private property will be maintained as long as physically possible. Pedestrian access and access for emergency services will be guaranteed throughout the duration of the works.

For businesses and deliveries:

The City of Luxembourg will try to ensure access for deliveries to local businesses throughout the duration of the works.

For public transport users:

Buses are once again calling at the stop on Rue Pierre Krier. This will remain the case until works begin on the pavement.

Progress to date

Project update:

The works are being performed from 7:00 to 18:00 by a consortium of two contractors (SOGEROUTE/KUHN).

How long will the work take?

Planned completion: April 2021

What work has already been completed?

Works to lay temporary gas mains on Rue Henri Vannérus and Rue Marguerite-Séraphine Beving have been completed. Works to lay temporary pipes on the even-numbered side of Rue Xavier de Feller have been completed.

What remains to be done?

The installation of temporary water and gas mains on the odd-numbered side, part of the work on the sewer network, and the installation of new water and gas mains on Rue Xavier de Feller. Before performing roadworks on Rue Xavier de Feller, the contractor must perform works on the dry utility networks under the pavement. Afterwards, the contractor will carry out works on the water and gas networks on the even-numbered side of the road, under the intersection of Rue des Près and Rue Xavier de Feller in the direction of Rue Marguerite-Séraphine Beving.

Your home utility connections

  • As part of the construction project, City representatives and private contractors will visit residents' homes
  • to assess the condition of their existing connections.
  • If you wish to have your existing connections replaced, please inform the City representatives during this on-site inspection.

If you experience any problems with your gas, water or communications networks, please call the numbers below, which are available 24/7:

  • Service Eaux – Tel: 4796-2883
  • Creos Électricité – Tel: 8002-9900
  • Creos Gaz – Tel: 8007-3001
  • Post Luxembourg – Tel: 8002-8004
  • Eltrona – Tel: 499 466 888

Stay informed

To make life easier for residents while these works are being carried out, the City of Luxembourg has implemented a series of measures, including the option to participate in meetings regarding the progress of the work. Residents affected by the works may participate in these meetings to obtain additional information about the project's progress and present any complaints they may have.

Weekly site meetings

Every Monday at 14:30 at the site.

Contacts for this work site

DEPARTMENT

CONTACT

PHONE NO.

Creos Luxembourg Gaz

Gilles Garganese

2624-5839

VDL – Service Eaux

Steve Philippi

4796-4346

VDL – Service Circulation

Charel Hoffmann

4796-2313

VDL – Service Éclairage public

Karim Ainahi

4796-3883

VDL – Service Voirie

Joé Welter

4796-2512

VDL – Service Canalisation

Gilles Biskup

4796-3302

VDL – Construction mediators

chantiers@vdl.lu

4796-4343

Creos Luxembourg Électricité

Claude Almeida

2624-5783

POST Télécommunication

Bureau Technique (Technical Office)

4991-5763


Contact
the department

Contact details

Opening hours

Monday–Friday

8:30–17:00