Bonnevoie: Rue Marguerite-Seraphine Beving, Rue Xavier de Feller, Rue JB. Gellé, Rue Henri Vannerus, Rue Pierre Krier

Project description

Creos Gaz, in cooperation with the City of Luxembourg, is currently improving infrastructure in Bonnevoie. Work will be carried out on the following roads: Rue Marguerite-Seraphine Beving, Rue Xavier de Feller, Rue Jean-Baptiste Gellé, Rue Henri Vannerus, and Rue Pierre Krier. The following departments will be involved in this collaborative effort:

  • VDL – Service Voirie (Roads Department): alteration of crossings to meet the needs of people with reduced mobility (PRM) and upgrading of bus stops.
  • VDL – Service Eaux (Water Department): replacement of the principal water mains and replacement of home utility connections.
  • Service Canalisation (Sewer Department): replacement of the wastewater and rainwater drains, and of connections to houses.
  • VDL – Service Éclairage public (Public Lighting Department): replacement of public lighting.
  • VDL – Service Circulation (Traffic Department): extension and upgrade of the existing network.
  • Creos Luxembourg SA Gaz: replacement of gas mains and certain home connections.
  • Creos Luxembourg SA Électricité: Replacement of the electrical cables in the pavement as well as certain connections to houses.

Works schedule

Commencement of work: September 2019

Planned duration: 350 working days

Planned completion: April 2021

Traffic information

What is the current traffic situation?

For vehicular traffic:

The affected sections will be closed off to traffic as the project progresses. At all times, a 3.5-metre passage will remain open to cars.

Since the beginning of these roadworks, Rue Béving and Rue Vannérus have been closed to all traffic except local residents and suppliers. As of 9 November 2019, Rue Pierre Krier will also be closed to traffic on the section between Rue de Carignan and Rue Gellé for a minimum period of 2 weeks.

Vehicular access to private property will be maintained as long as physically possible. Pedestrian access and access for emergency services will be guaranteed throughout the duration of the works.

For businesses and deliveries:

The City of Luxembourg will try to ensure access for deliveries to local businesses throughout the duration of the works.

For public transport users:

The bus stop on Rue Pierre Krier will be temporarily moved while work is being carried out on the pavement and sewers.

Progress to date

Project update:

Work began in September 2019.

How long will the work take?

Planned completion: April 2021

What work has already been completed?

The contractor is currently finishing up the installation of temporary gas lines on Rue Henri Vannerus and Rue Marguerite-Seraphine Beving.

What remains to be done?

The installation of temporary water and gas lines on Rue Xavier de Feller. This will be carried out until the collective winter leave.

Your home utility connections

  • As part of the construction project, City representatives and private contractors will visit residents' homes
  • to assess the condition of their existing connections.
  • If you wish to have your existing connections replaced, please inform the City representatives during this on-site inspection.

If you experience any problems with your gas, water or communications networks, please call the numbers below, which are available 24/7:

  • Service Eaux – Tel: 4796-2883
  • Creos Électricité – Tel: 8002-9900
  • Creos Gaz – Tel: 8007-3001
  • Post Luxembourg – Tel: 8002-8004
  • Eltrona – Tel: 499 466 888

Stay informed

To make life easier for residents while these works are being carried out, the City of Luxembourg has implemented a series of measures, including the option to participate in meetings regarding the progress of the work. Residents affected by the works may participate in these meetings to obtain additional information about the project's progress and present any complaints they may have.

Weekly site meetings

To be determined. The date will be published shortly.

Contacts for this work site

DEPARTMENT

CONTACT

PHONE NO.

Creos Luxembourg Gaz

Gilles Garganese

2624-5839

VDL - Service Eaux

Steve Philippi

4796-4346

VDL – Service Circulation

Charel Hoffmann

4796-2313

VDL – Service Éclairage public

Karim Ainahi

4796-3883

VDL – Service Voirie

Joé Welter

4796-2512

VDL – Service Canalisation

Gilles Biskup

4796-3302

VDL – Construction mediators

chantiers@vdl.lu

4796-4343

Creos Luxembourg Électricité

Claude Almeida

2624-5783

POST Télécommunication

Bureau Technique (Technical Office)

4991-5763