Project description

The City of Luxembourg is carrying out upgrade works in Belair, on Avenue des Archiducs and Allée Léopold Goebel. These works are being done in cooperation with:

  • Service Canalisation (Sewer Department): Replacement of the water collection system(s) between Allée Léopold Goebel and Rue Mathieu Lambert Schrobilgen. Replacement of deteriorated home utility connections.
  • Service Eaux (Water Department): Replacement of deteriorated connections to houses.
  • Service Éclairage public (Public Lighting Department): Replacement of cables for public lighting systems and street lamps.
  • Service TIC (ITC Department): Extension and upgrade of the City of Luxembourg's fibre-optic network. Extension of the Hotcity network.
  • Service Voirie (Roads Department): Upgrade of the road and pavements on Avenue des Archiducs. Upgrade of the roundabout on Allée Léopold Goebel. Installation of pedestrian crossings for people with reduced mobility.
  • Creos Luxembourg SA Électricité: Replacement of the electrical cables in the pavements and the connections to houses.
  • Creos Luxembourg SA Gaz: Replacement of deteriorated connections to houses.
  • Post Luxembourg: Replacement and enhancement of networks in the pavement and of the connections to houses.

Works schedule

Commencement of work: October 2018

Planned duration: 220 working days

Planned completion: spring 2020

Traffic information

What is the current traffic situation?

For vehicular traffic:

Traffic is now running as normal on Avenue des Archiducs and Allée Léopold Goebel. However, both of these roads will be closed to traffic during surfacing work. Pedestrian access and access for emergency services will be guaranteed throughout the duration of the works.

For businesses and deliveries:

The City of Luxembourg will try to ensure access for deliveries to local businesses throughout the duration of the works.

For public transport users:

No changes.

As work progresses, there will be changes to the flow of traffic in this area.

Progress to date

How long will the work take?

Planned completion: spring 2020

What work has already been completed?

The works on the sewers, water mains and gas mains, as well as the installation of the dry utility networks and road superstructure have been completed.

What remains to be done?

For the final stage of the works, the contractor will lay the road surface on Avenue des Archiducs and on the roundabout on Allée Léopold Goebel. This will be done as soon as weather conditions permit.

Stay informed

To make life easier for residents while these works are being carried out, the City of Luxembourg has implemented a series of measures, including the option to participate in meetings regarding the progress of the work. Residents affected by the works may participate in these meetings to obtain additional information about the project's progress and present any complaints they may have.

Weekly site meetings

Every Friday at 9:30 at the site.

Contacts for this work site

DEPARTMENT

CONTACT

Phone

VDL – Service Coordination des chantiers (Work Site Coordination Department)

Romain Dias

4796-3166

VDL – Service Eaux

Carole Kirch

4796-4304

VDL – Service TIC

Micael Da Silva

4796-3380

VDL – Service Circulation (Traffic Department)

Josh Den Hollander

4796-3344

VDL – Service Éclairage public

Daniel Perrard

4796-4989

VDL – Service Voirie

Caroline Blaise

4796-2608

VDL – Service Canalisation

Gilles Biskup

4796-3302

VDL – Construction mediators

chantiers@vdl.lu

4796-4343

Creos Luxembourg Gaz

Gary Scheid

2624-5821

Creos Luxembourg Électricité

Marco Ferreira

2624-5780

POST Télécommunication

CALL CENTRE

8002-8004


Contact
the department

Contact details

20-22, rue des bains
L-1212 Luxembourg

Opening hours

Monday–Friday

8:30–17:00


Contact
the department

Contact details

3, rue du Laboratoire
L-1911 Luxembourg

Getting there by bus